Chinese New Year 2027 falls on Saturday 6 February, eleven days earlier than in 2026. For anyone ordering custom medals from China that one calendar fact moves every deadline forward: factories in Guangdong slow down from mid-January, close for the official holiday, and take weeks to get back to full output. If your medals must arrive before the holiday, the artwork needs to be approved in the first half of December for air freight, and earlier still for sea. This guide lays out the dates, explains why medals are hit harder than stock goods, and gives a back-planning table you can drop into your own schedule.
When does Chinese New Year 2027 stop production?
The holiday itself is short. The official public holiday is expected to run from 5 to 12 February 2027, and China’s State Council usually confirms the final calendar in November or early December. The disruption is much longer than the holiday, because workers travel home early and return late.
Two logistics guides published this year put numbers on it. An importer guide from EasyImex describes a pre-holiday slowdown of two to four weeks starting around 15 January 2027, a ramp-up of two to four weeks from mid-February, and a total disruption window of six to eight weeks. It also notes that 10 to 30 percent of factory workers may not return to their previous employer after the holiday. SEKO Logistics breaks the same period into four phases: a slowdown from 9 to 16 January, a complete shutdown from 30 January to 14 February, a gradual restart from 20 February to 6 March at roughly a third of normal workforce, and full recovery four to six weeks after the holiday begins, which lands in the first half of March 2027.
Our factory is in Foshan, Guangdong, and follows the same pattern: a stepped slowdown as teams leave, a full stop over the holiday, and a staged return. Ask us for our exact closure dates when you request your quote, so your plan is built on the real calendar rather than an estimate.
Why custom medals feel the shutdown earlier than stock goods
A warehouse of finished stock can ship right up to the last truck. A custom medal cannot, because it passes through several separate workstations in sequence: die engraving, stamping or die-casting, polishing, electroplating, enamel colouring, epoxy, ribbon assembly and packing. Each stage has its own skilled team, and the polishing and enamel teams are exactly the people who travel furthest and leave first. When a plating line is down to half its staff, a job that normally takes a day takes two, and the delay compounds down the chain.
There is also a quality angle. The last week before closure and the first weeks after it are when new hands are most likely to be on the line. A medal order that lands in that window is not necessarily late, but it is the order most likely to need a second look at plating consistency. Planning to finish production before the slowdown is as much about quality as it is about dates.
How long a custom medal order takes
Our timings, as published on our how it works page, are the same all year. What changes before the holiday is how much buffer you need around them.
| Step | What happens | Time |
|---|---|---|
| Design draft | Our team prepares the design draft and vector artwork (USD 100 per design, credited against your order) | Depends on your feedback rounds |
| Artwork approval | You sign off the final drawing | Your side |
| Sample | We make a physical sample and ship it to you | 7 days from artwork approval, plus courier time |
| Sample approval | You check the real medal in hand | Your side |
| Production | Mould (USD 420 per design, charged once; we keep it for repeat orders), stamping, plating, enamel, ribbons, packing | Factory time including the sample is 14 days, counted from sample approval |
| Shipping | DDP by air, DDP by sea, CIF or EXW | Depends on route and season |
Two things in that table matter most in December and January. First, the courier leg for the sample is outside anyone’s control and slows down over the holidays in your country as well, so allow a full week for it. Second, a repeat order on an existing mould can skip the mould step and often the sample as well, which is the single biggest time saving available to you.
Order deadlines for Chinese New Year 2027: work backwards
The table below is our suggested planning calendar for a new design with one sample round. It assumes production should be finished before the mid-January slowdown described above, and uses the freight timing from the SEKO guide: ocean cargo should ideally move 14 to 21 days before the holiday and air cargo 7 to 14 days before. These are planning dates, not promises; your quote will carry the dates for your specific order.
| Target | Production finished by | Approve sample by | Approve artwork by | Deposit and brief in by |
|---|---|---|---|---|
| Arrive before the holiday, by sea | Early January 2027 | Mid-December 2026 | Early December 2026 | Now, in November 2026 |
| Arrive before the holiday, by air | Around 15 January 2027 | Around 5 January 2027 | Mid-December 2026 | Early December 2026 |
| Repeat order, existing mould, by air | Around 15 January 2027 | Not needed if nothing changes | Confirm by early January 2027 | Late December 2026 |
| Can wait until after the holiday | Early to mid March 2027 | Mid-February 2027 | Any time in January | January 2027 |
A few notes on reading it:
- Sea is already tight. Ocean rates typically start climbing from mid-December and carriers announce increases every one to two weeks through January, according to SEKO, who also recommend booking space four to five weeks before departure rather than the usual three to four. If your medals need to be on a vessel in mid-January, the deposit and artwork should be with us this month.
- Air buys you about a month. The air route moves the artwork deadline from early to mid-December and tolerates a sample round in the last week of the year, provided you decide on the sample the day it arrives.
- Second sample rounds cost a week each. If your design has fine enamel lines or a new plating combination, budget for two rounds and move every date one week earlier.
- The quiet weeks after the holiday are real. If your event is in April or later, placing the order in January for March production puts you in the lowest-pressure window of the year, and freight capacity is easier to find once the pre-holiday rush has shipped.
The Christmas air window is closing at the same time
Chinese New Year is not the only deadline this quarter. If you are planning a year-end ceremony, the peak-season calendar from GoFreight puts the holiday rush at 1 October to 15 December 2026, with air freight peaking in November and December and an air shipping deadline of 5 December for goods that must arrive for Christmas. The ocean deadline for Christmas arrival passed in mid-October, so December deliveries are now an air-freight conversation.
Working backwards from a 5 December departure with our timings, artwork for a new design should be approved around 20 November 2026 for a December ceremony, and a repeat order on an existing mould can start about a week later. If that date has passed by the time you read this, the honest options are a small air shipment for the ceremony and a sea shipment for the remainder, or shifting the presentation into January.
Five ways to protect your delivery date
- Reuse a mould you already own. We keep moulds for repeat orders, so a second run of last year’s medal skips engraving and usually skips the sample. If a date or a sponsor changes, a small artwork change on the same mould is far quicker than a new one.
- Brief the ribbon and the box with the medal, not after. Medal ribbons and packaging boxes are separate production lines with their own schedules. A medal that is finished on time but waiting for a printed ribbon is still late. Our medal packaging guide covers the options and their weight, which matters for air.
- Split the shipment by purpose. Air the quantity you need for the ceremony under DDP by air, and sea the stock for later distribution under DDP by sea or CIF. Our terms page explains what each Incoterm covers so you can compare landed cost rather than freight alone.
- Approve in one pass. Gather every stakeholder before the artwork arrives, and have the person who signs off the sample available on the day it lands. Each day a proof waits in an inbox is a day lost at the plating line.
- Get the dates in writing. Ask for the factory closure dates and the cargo-ready date with your quote, and verify them again in early December. SEKO recommends confirming cargo-ready dates with suppliers in November and December for exactly this reason.
What to send us to start the clock
The fastest orders are the ones where the brief is complete on day one. For a quote that already carries dates, send:
- Quantity (our minimum is 100 pieces per design) and the event date.
- Medal size and thickness, or a reference photo of a medal you like.
- Plating finish and enamel colours, or your logo colours as Pantone references.
- Ribbon width, colour and print, or “plain ribbon” if you want the quickest option.
- Packaging: poly bag, paper box, velvet box or none.
- Destination country and whether you want a DDP price so duties are handled before arrival.
- Whether this is a repeat of an earlier design, so we can check the mould.
With that list we can return a design draft, a sample date and a shipping date against the holiday calendar, instead of a quote that leaves the scheduling to you. If you want medals on hand before Chinese New Year 2027, request a quote this month and we will show you which of the routes above still fits.